References
Operational today, across the US.
Our dryers aren't concepts — they run every day at wastewater treatment plants. Visit one, talk to the operators, and see the cake for yourself.
- Henderson, Kentucky Since 2023
America's first ELODE
Henderson Water Utility, North WWTP — ELODE 3000 on belt-pressed municipal cake.
Read the case study ↓ - Wisconsin 2026
2 more ELODEs
Two new ELODE installs bring electro-osmosis drying to a municipal wastewater treatment plant in Wisconsin.
Details coming soon
- Alabama 2026
America's first EVD
The first US Evaporative Dryer install — low-temperature heat-pump drying to 90%DS+.
Details coming soon
More installs are in the pipeline for the coming years.
Case study · Henderson Water Utility · North WWTP · Kentucky
30 tons of sludge in. 11 tons out. Every day since 2023.
-
62%
weight reduction on belt-pressed cake
-
15→40%DS
one 3-minute pass, no heat
-
30→11wtpd
hauled weight, daily
-
“We are saving so much money with this machine.”
Bart · General Manager · Oct 2023 -
“It really does reduce our solids by 60% in 3 minutes. This technology could be a game-changer for our industry.”
Josh · Superintendent · Feb 2024 -
“We're glad we bought the ELODE machine. It is even more valuable because it gives us goodwill with the Daviess County landfill. They love our sludge. It is a slam dunk decision.”
Kevin · Director of Operations · Jan 2025
In the press
"A Revolution: Dewatering Biosolids with Electro-Osmosis"
Treatment Plant Operator (TPO) Magazine covers the Henderson install — February 2024.
Read the article →