References

Operational today, across the US.

Our dryers aren't concepts — they run every day at wastewater treatment plants. Visit one, talk to the operators, and see the cake for yourself.

  • Henderson, Kentucky Since 2023

    America's first ELODE

    Henderson Water Utility, North WWTP — ELODE 3000 on belt-pressed municipal cake.

    Read the case study ↓
  • Wisconsin 2026

    2 more ELODEs

    Two new ELODE installs bring electro-osmosis drying to a municipal wastewater treatment plant in Wisconsin.

    Details coming soon

  • Alabama 2026

    America's first EVD

    The first US Evaporative Dryer install — low-temperature heat-pump drying to 90%DS+.

    Details coming soon

More installs are in the pipeline for the coming years.

Case study · Henderson Water Utility · North WWTP · Kentucky

30 tons of sludge in. 11 tons out. Every day since 2023.

Watch the overview video (1 min) →
  • 62%

    weight reduction on belt-pressed cake

  • 15→40%DS

    one 3-minute pass, no heat

  • 30→11wtpd

    hauled weight, daily

  • “We are saving so much money with this machine.”
    Bart · General Manager · Oct 2023
  • “It really does reduce our solids by 60% in 3 minutes. This technology could be a game-changer for our industry.”
    Josh · Superintendent · Feb 2024
  • “We're glad we bought the ELODE machine. It is even more valuable because it gives us goodwill with the Daviess County landfill. They love our sludge. It is a slam dunk decision.”
    Kevin · Director of Operations · Jan 2025
The ELODE 3000 installed at Henderson Water Utility's North WWTP in Kentucky

In the press

"A Revolution: Dewatering Biosolids with Electro-Osmosis"

Treatment Plant Operator (TPO) Magazine covers the Henderson install — February 2024.

Read the article →

Want to be our next reference?

Test your sludge on a commercial-scale unit and see the results before you buy.

Contact Us →